{"id":393,"date":"2026-07-19T11:41:49","date_gmt":"2026-07-19T11:41:49","guid":{"rendered":"https:\/\/guardianangelsfoundation.nl\/?page_id=393"},"modified":"2026-08-20T17:24:20","modified_gmt":"2026-08-20T17:24:20","slug":"project-construction","status":"publish","type":"page","link":"https:\/\/guardianangelsfoundation.nl\/?page_id=393","title":{"rendered":"Project Construction"},"content":{"rendered":"\n<h3 class=\"wp-block-heading has-text-align-left\">Description<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In 2018, <strong>&#8216;The Man of God&#8217; invested in the construction of a new building containing five classrooms.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At present, the school site includes a partially completed structure with a foundation and walls already in place. Due to a lack of financial resources, construction has been halted and the building is awaiting completion and interior finishing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>This is the foundation&#8217;s most ambitious project and potentially the one with the greatest long-term impact.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once completed, the new school building could increase the school&#8217;s capacity from approximately <strong>100 pupils to 400 pupils.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Such growth will have significant implications for classroom furnishing, staffing levels, daily meal preparation, learning materials, and overall operational requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is therefore essential that this development is carefully planned to ensure that the quality of education and care provided to the current pupils is maintained as the school grows.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Needs <\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Proper roofing <\/li>\n\n\n\n<li>Plastering and painting of the classrooms<\/li>\n\n\n\n<li>Expansion of the water installation<\/li>\n\n\n\n<li>Expansion of the elektrical installation &#8211; thinking about solar panels en batteries.<\/li>\n\n\n\n<li>Additional sanitary provisions<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Additional requirements<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Storage rooms for food supplies and a kitchen<\/li>\n\n\n\n<li>An office and staff room for teachers<\/li>\n\n\n\n<li>Furniture, blackboards, and classroom equipment<\/li>\n\n\n\n<li>Additional requirements to be determined during the planning phase<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Current status<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Construction started in 2018 and is currently at a standstill.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The foundation and walls have already been completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We have received proposals from local contractors for roofing, plastering, and painting works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Active fundraising is required<\/strong>, as the total investment needed to complete the building is currently estimated at <strong>\u20ac30,000\u2013\u20ac50,000<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A building design already exists, but it still needs to be reviewed to ensure that it meets the requirements of a safe, durable, and sustainable school facility.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Impact<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Completing this building would significantly increase the school&#8217;s capacity and create opportunities for many more children to access education.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The expansion would provide five additional classrooms and support the long-term development of the school.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, growth must be carefully managed. Additional pupils will require more teachers, learning materials, meals, sanitation facilities, and operational support. Our goal is not simply to increase capacity, but to ensure that every child continues to receive the quality of education and care they deserve.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Financial<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Estimated investment required: \u20ac30,000 -\u20ac50,000<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Final costs will depend on the outcome of the design review, contractor quotations, and the scope of the additional facilities required to support the expansion.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Pictures<\/h3>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"381\" src=\"https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/07\/New-building-1-edited-fotor-20260718132937-e1784374219107-fotor-20260718143149.png\" alt=\"\" class=\"wp-image-381\" srcset=\"https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/07\/New-building-1-edited-fotor-20260718132937-e1784374219107-fotor-20260718143149.png 1024w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/07\/New-building-1-edited-fotor-20260718132937-e1784374219107-fotor-20260718143149-300x300.png 300w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/07\/New-building-1-edited-fotor-20260718132937-e1784374219107-fotor-20260718143149-150x150.png 150w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/07\/New-building-1-edited-fotor-20260718132937-e1784374219107-fotor-20260718143149-768x768.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"662\" src=\"https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/08\/New-building-2-1024x768.jpeg\" alt=\"\" class=\"wp-image-662\" srcset=\"https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/08\/New-building-2-1024x768.jpeg 1024w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/08\/New-building-2-300x225.jpeg 300w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/08\/New-building-2-768x576.jpeg 768w, https:\/\/guardianangelsfoundation.nl\/wp-content\/uploads\/2026\/08\/New-building-2.jpeg 1040w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Description In 2018, &#8216;The Man of God&#8217; invested in the construction of a new building containing five classrooms. At present, the school site includes a partially completed structure with a foundation and walls already in place. Due to a lack of financial resources, construction has been halted and the building is awaiting completion and interior [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":299,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-393","page","type-page","status-publish","hentry","post"],"_links":{"self":[{"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/pages\/393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=393"}],"version-history":[{"count":6,"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/pages\/393\/revisions"}],"predecessor-version":[{"id":663,"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/pages\/393\/revisions\/663"}],"up":[{"embeddable":true,"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=\/wp\/v2\/pages\/299"}],"wp:attachment":[{"href":"https:\/\/guardianangelsfoundation.nl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}