Description
The objectives of this project have been successfully achieved, and the project is now considered complete within the scope of the current programme.
The school relied entirely on water supplied by tanker trucks. The water was stored in a central storage tank and in hundreds of yellow jerry cans. Obtaining this water is costly, particularly in light of the significant increase in fuel prices. The school’s borehole was declared unsafe and was closed by the authorities some years ago because of contamination and the associated health risks.
Needs
- A newly drilled borehole, equipped with PVC water pipes and an electric pump.
- A network of water pipes providing clean water to the school buildings and sanitary facilities, equiped with taps.
- A masonry enclosure surrounding the borehole to protect it from damage, unauthorized use, and contamination.
- Installation of a second 5,000-litre water storage tank alongside the existing 2,500-litre tank. This will ensure that the school has a reliable and sustainable water supply for the long term.
- Installation of two water access points for the local community, allowing residents to make free use of the pumped water.
Wishlist
Because the water supply depends on an electric pump, the system is vulnerable to interruptions. Kenya Power experiences regular power outages, which can temporarily prevent the pump from operating. To ensure a reliable water supply, it would be desirable to install a solar power system with battery storage as a backup energy source.
The solar energy component will be further elaborated in the Facilities Project.
Current status
This project was launched at the end of June 2026.
At that time, the borehole was successfully drilled and became fully operational. The electric water pump was installed, and construction of the masonry protective structure around the borehole was completed. In addition, the school principal temporarily installed a water access point near the sanitation facilities, allowing pupils and staff to benefit from clean water immediately.
In September 2026, all water distribution pipes were installed, connecting the school building, the upgraded sanitation facilities, and the planned vegetable garden. A second water storage tank was installed and connected to the system, and the water supply lines for the local community were extended to the boundary of the school grounds.
The objectives of this project have been successfully achieved, and the project is now considered complete within the scope of the current programme.
Impact
The installation of a clean water supply has significantly improved hygienic conditions at the school while at the same time reducing costs. There is now effectively “free” water available for everyone.
Immediately after the water system was completed, the children enjoyed taking showers under the hose, relishing the rare opportunity not to have to conserve every drop of water. It was a joyful moment that clearly demonstrated the positive impact of having access to a reliable source of clean water.
Now that the school has access to its own water source, the goal of establishing a vegetable garden is finally within reach. A major obstacle to creating and maintaining the garden has been removed, as a reliable supply of water is now available. The vegetable garden will help provide fresh, nutritious produce for the school meals, while also contributing to the long-term sustainability of the project.
Financial
Executed in June 2026
| Description | Total in KES | Remarks |
| Borehole – complete | 90,000 | Complete installation |
| Enclosure of the well | 8,600 | Protection of the installation |
| First fitting of pipe network + taps | 0 | By Headmaster and community |
| One time investment | KES 98,600 | € 695 |
Executed in September 2026
| Description | Total in KES | Remarks |
| 5000 liter water container + materials to expand the current tower | 50,000 | quote from a contractor |
| Pipes, taps, materials, transport | 30.500 | |
| Labour | 10.000 | |
| One time investment | KES 90.500 | € 635 |
On Average € 1,00 = KES 150, with the cost of exchange and handling fee from banks and MPesa (Kenia mobile banking) the net amount of € 1,00 = KES 142,50 – so we calculate with this rate.